Deck Build — Denver, CO
Redwood Deck Build
A redwood deck built in Denver from a cleared backyard corner through taped joist framing and ledger attachment to a finished deck with a wrap-around step platform.
Case study details
Challenge
- The backyard corner needed to be cleared and graded before any deck framing could start, giving the crew a clean, level area to build from.
- The deck ties into the home with a ledger board and sits above an existing curved concrete patio, so the framing had to line up with both the house and the grade below.
Work
- Site prep photos show the yard cleared and graded ahead of construction.
- Framing photos show redwood deck joists set with joist tape and galvanized hangers, plus an elevated section with taped joists and a ledger tied into the home above a flagstone patio.
Outcome
- The finished photos show a completed redwood deck with a wrap-around step platform that ties into the existing curved concrete patio below.
/ In photos
Project sequence
/ Keep exploring
Related services
Local contractor information
General Contractor in Denver, CORelated case studies
/ Next step
Start a project like this Denver, CO
Tell us what you are planning. We walk the site, talk through what it actually takes, and send a line-item estimate you can read.