Fence Replacement — Denver, CO
Cedar Fence Replacement
A side-yard fence replacement in Denver, shown before as an old, leaning, weathered wood fence and after as a new cedar dog-ear privacy fence with a fresh mulch bed.
Case study details
Challenge
- The before photo shows an old wood fence leaning and falling apart along the side yard, in need of full replacement.
Work
- The old fence line was removed and replaced with new cedar dog-ear privacy fencing along the same side yard.
Outcome
- The after photo shows a new cedar dog-ear privacy fence installed along the side yard with a fresh mulch bed.
/ In photos
Project sequence
/ Keep exploring
Related services
Local contractor information
General Contractor in Denver, CORelated case studies
/ Next step
Start a project like this Denver, CO
Tell us what you are planning. We walk the site, talk through what it actually takes, and send a line-item estimate you can read.