Structural Remodel — Denver, CO
Lower-Level Structural Remodel
A lower-level structural remodel in Denver, documented from demolition and temporary support framing through under-slab plumbing and new stud framing to an engineered beam spanning the space on steel columns.
Case study details
Challenge
- The lower level needed demolition and temporary support framing before the structural beam work could begin.
- New plumbing required the concrete slab to be cut and trenched between the framed walls for under-slab runs.
Work
- Photos show the sequence of work: demolition with temporary support framing, a slab trenched for plumbing, new stud framing forming a hallway layout, and an engineered beam carried on black steel columns.
Outcome
- The final photo shows the new engineered beam spanning the lower level on steel columns after the joist repair work was completed.
/ In photos
Project sequence
/ Keep exploring
Related services
Local contractor information
General Contractor in Denver, CORelated case studies
/ Next step
Start a project like this Denver, CO
Tell us what you are planning. We walk the site, talk through what it actually takes, and send a line-item estimate you can read.