Bathroom Remodel — Denver, CO
Bathroom Remodel: Before & After
A full Denver bathroom remodel documented from the original beige tile surround and wood vanity through DensShield backer board and tile setting to the finished marble-look shower and floor.
Case study details
Challenge
- The original bathroom had a beige tile surround and a wood vanity that were being fully replaced as part of this remodel.
Work
- In-progress photos show large wall tile being installed, followed by DensShield backer board, a waterproofed niche, and marble checkerboard floor tile being set.
Outcome
- The after photo shows the finished bathroom with marble-look shower walls and dark floor tile in place of the original surround and vanity.
/ In photos
Project sequence
/ Keep exploring
Related services
Local contractor information
General Contractor in Denver, CORelated planning guides
Related case studies
/ Next step
Start a project like this Denver, CO
Tell us what you are planning. We walk the site, talk through what it actually takes, and send a line-item estimate you can read.
