Structural Repair — Denver, CO
Structural Beam Replacement
A main beam replacement in a Denver basement, shown from demolition of the original beam through new support framing to the finished beam carried on steel posts.
Case study details
Challenge
- The original main beam required replacement, and the before photo shows demolition underway around it to prepare for the new structural work.
Work
- The during photo shows new framing installed along the support line as the replacement beam goes in.
Outcome
- The after photo shows the new main beam in place with steel support posts carrying the load.
/ In photos
Project sequence