Fire Rebuild & Framing — Highlands Ranch, CO
Fire Rebuild & Framing in Highlands Ranch
A fire-damage rebuild in Highlands Ranch taken back to the studs and re-framed, including vaulted ceiling framing, a rebuilt stair tower, and new window and door openings across the open great room.
Case study details
Challenge
- After fire and smoke damage, the interior had to be stripped back to bare framing and subfloor before anything could be rebuilt — drywall, insulation, and finishes were removed across multiple levels.
- Because the home is open to below at the great room and stairs, the rebuild had to keep the two-story structure supported while walls, rafters, and openings were re-framed.
Work
- The photos show full interior demolition back to studs, with new stud walls laid out for the rebuilt floor plan and vaulted ceiling framing rebuilt overhead.
- The stair tower and two-story window wall were re-framed around the existing staircase, with new headers and rough openings set for replacement windows and patio doors.
- Mechanical, plumbing, and electrical rough-in runs through the open framing, with R-38 ceiling insulation and new plumbing stock staged for the next phase.
Outcome
- The rebuilt frame shows the home squared away and ready for insulation, drywall, and finishes — vaulted ceilings intact, stair tower rebuilt, and daylight back through new window openings.
/ In photos
Project sequence
/ Keep exploring
Related services
Home Additions
Room additions, second-story expansions, and bump-outs for Front Range homes, tied structurally and aesthetically into your existing house.
Basement Finishing
Full basement finishing for Denver metro homes, from framing and egress windows to electrical, drywall, and finish carpentry.
Custom Home Building
Ground-up custom homes and ADUs for Front Range lots, built by a general contractor who manages excavation through final trim.
Related case studies
/ Next step
Start a project like this Highlands Ranch, CO
Tell us what you are planning. We walk the site, talk through what it actually takes, and send a line-item estimate you can read.